Pictures: Ayade inspecting installation of 30 MW embedded power plant Calabar

0
176
Reading Time: < 1 minute
Ayade inspecting the installation at Parliamentary, Calabar 
Efio-Ita Nyok|14 March 2017
Governor Ayade inspecting the arrival and installation of power generating plants for the 30 mega watts embedd power plant at the parliamentary axis of Calabar.
Efio-Ita Nyok
Is a Blogger, the Editor & Publisher of NegroidHaven.org